Deck installation: permits, footings, the ledger and what a quote should say

A deck is a structure that people stand on, so the permit, the footings and the connection to the house matter more than the boards you see.

By LawnElm Editorial Team Updated 7 min read

Priced by
Deck square foot
Season
When soil and permit allow
Do it yourself?
Partly; permit and ledger
Illustration: a wood deck frame with footings, joists and a ledger board fastened to a house wall

Short version

Most new decks need a permit and an inspection, set by your city or county. Call 811 before the footing holes are dug, ask the building office what footing depth and plans it wants, and have the ledger that ties the deck to the house done to local code. Count boards and joists with the fence and deck calculator to check a quote. Hire a crew or a designer for a raised deck or one on a slope, and do not skip the inspection.

What the job is

A deck is footings in the ground, posts and beams on top of them, joists across the beams, and boards across the joists, usually with a railing and stairs. A deck attached to the house is also tied to the house wall by a ledger board. The tool and the quote deal with the same parts, in the same order.

Crews quote decks by the square foot of deck, with stairs, railings and removal of an old deck priced separately. The job is not tied to a grass belt, and no extension source cited here gives a deck-building calendar. Ask your building office how long plan review takes, and what it requires for frozen ground.

Permit, code and inspections

New deck construction is regulated by the local jurisdiction, as the American Wood Council puts it, and the rules change from place to place. The City of Madison, Wisconsin is one example. Its page says you need a permit to build a deck, asks for a site plan if the deck is over three feet high, and asks for drawings that show post locations, beam sizes, and joist size and spacing. It requires an inspection after the footing holes are dug and before the footings go in, and a final inspection.

That is Madison, not a national rule. Your city may set different plan requirements, different heights for the guardrail and different setbacks, and a homeowners' association may require approval first. Call your local building office before you buy anything. The general version is in fence and deck permits, and HOA and city yard rules covers the neighborhood layer. The state pages show where to start for your state.

Footings, frost and 811

Footings carry the load to the ground, and how deep they go depends on local code and on how deep the ground freezes where you live. Madison's page, for example, says footings must be at least 48 inches deep to prevent frost heaving, and that its inspectors help decide the footing type. Your depth may be different, so ask your building office instead of using a number from another place.

Every footing is a hole, so call 811 first. The request is free, and the wait differs by state; see call 811 before you dig. Do it before the crew or you start digging, even for a shallow hole.

The ledger and the connection to the house

The ledger is where many decks fail. The American Wood Council, a wood products trade association, says deck collapses most often result from failure of the ledger connection, that the ledger should be attached to the house with bolts or lag screws rather than nails, and that it should be flashed or caulked so water does not reach the house band joist. It says a deck with only nail heads showing on the ledger is likely nailed only. Spacing and size depend on the joist span and the local code, and LawnElm does not give engineering advice.

Wood for the frame and the boards

The USDA Forest Products Laboratory guide to pressure-treated wood, FPL-GTR-275 from December 2019, sorts treated lumber into use categories. It describes deck boards as UC3B for most applications, with UC4A warranted in some cases, such as decks within 6 inches of the ground. Joists and headers are UC3B or UC4A depending on the situation, and support posts are UC4A or UC4B. It also advises applying preservative to saw cuts and bolt holes that expose untreated wood.

Ask the crew which category each part meets and what the plan is for cut ends. The CPSC says that regular application of a penetrating oil- or water-based coating may reduce potential exposure to chemical residues from older CCA-treated wood. Sealing and upkeep are covered in deck repair and sealing.

Counting boards and joists

The fence and deck calculator counts the surface and the frame. Boards run along the length. Rows are the width in inches divided by board width plus gap, and each row needs the length divided by stock length, rounded up, boards. Joists run across the boards, one every joist spacing along the length plus one at the end.

Calculator example, a 16 by 12 foot deck with 5.5-inch boards, an eighth-inch gap, 16-foot boards and joists 16 inches on center
PartCount
Rows of boards26
Deck boards, 16 ft26
Joists13
Joist length in total156 ft

The tool leaves out footings, beams, ledgers, hardware, stairs and railings, so a quote has more lines than the tool does. Ask for each by name.

What a written quote should say

  • The deck size, height above grade, shape, and the stairs and railing included
  • Footing type and depth as the building office specifies it, and who pulls the permit
  • How the ledger is attached and flashed, or that the deck is freestanding
  • The use category of the posts, joists and boards, and what is done to cut ends
  • Who schedules each inspection, and what happens if one fails
  • Who calls 811, and who removes an old deck and its debris
  • The license number and a certificate of insurance, where your state requires them

Put the quote into the yard budget to see it per square foot next to other quotes. LawnElm publishes no prices; the numbers in the tool are yours.

Mistakes to avoid

  • Building without checking whether a permit is needed
  • Digging footings before the 811 request
  • Fastening the ledger with nails or leaving it unflashed
  • Using lumber of an unknown use category near the ground
  • Skipping an inspection that your building office requires
  • Signing an agreement that leaves the permit and inspections to you without saying so

Do it yourself or hire a crew

A low, freestanding deck is a manageable project for an experienced do-it-yourselfer who has the permit and follows the local plan. A raised deck, one attached to the house, or one on a slope is a job for a crew or a designer, because the footings and the ledger carry the people on it. The CPSC says to have a deck professionally inspected, and the American Wood Council says all decks, especially elevated ones, should be inspected regularly by a qualified professional. For the general test, see the DIY or hire guide. For fences, see fence installation.

Questions people ask

Do I need a permit to build a deck?

Usually, but your city or county decides. Madison, Wisconsin says you need a permit to build a deck. Call your local building office, and read fence and deck permits.

How deep should deck footings be?

Local code and the frost depth in your area set it. One city, Madison, says at least 48 inches, but yours may differ. Ask your building office.

Why is the ledger such a concern?

The American Wood Council says deck collapses most often result from failure of the ledger connection, and that the ledger should be fastened with bolts or lag screws, not nails. Ask how the ledger is bolted and flashed.

How many deck boards and joists will I need?

Enter the length, width, board size and joist spacing in the fence and deck calculator. A 16 by 12 foot deck with joists 16 inches on center has 13 joists.

Do I call 811 for footings?

Yes. Call before any digging, including footing holes. The request is free, and the wait differs by state.

Sources

The city example is one city and applies only there; your city or county sets your rules. Facts were checked on November 20, 2026. The American Wood Council paper is from 2020 and the CPSC checklist is from 2020, so ask your building office for the current requirements.