Rules
Call 811 before you dig: how the free locate works
Gas, electric, water and communication lines run through most yards, some of them shallow. One free call has them marked before the first post hole.
By LawnElm Editorial Team Updated 7 min read
- Number
- 811
- Cost
- Free
- Notice period
- Differs by state
Short version
Call 811, or use your state's 811 center website, before any digging, including fence posts, deck footings, trees and sprinkler lines. The request is free. Utilities mark their buried lines with paint or flags, and you dig carefully around the marks. How many days of notice you must give, who has to call and how long the marks last are set by each state, so the figures below are examples, not a national rule. Check your state on the state yards map and confirm the notice with your own center when you call.
What 811 is
811 is the national number for the call-before-you-dig service. The Federal Communications Commission announced that it designates 811 as the nationwide number to protect pipelines and utilities from excavation damage. The Common Ground Alliance, which runs 811beforeyoudig.com, calls it the free national before-you-dig service. Calling 811 takes you to your state's 811 center, and the utilities that have lines in the area then mark them.
This page explains the general steps. It cannot tell you the rule for your address. That depends on the state law and on which utilities serve your yard.
The steps
The Common Ground Alliance gives these steps for a homeowner.
- Contact 811 or your state 811 center's website a few business days before you begin any digging.
- Give the dig address, including the county and nearest cross street, the type of project and the exact digging area on the property.
- Wait for the utilities to respond. The Common Ground Alliance says to confirm that all of them have responded before you dig.
- Dig carefully around the marks, and consider relocating projects that sit close to buried lines.
The Alliance says utilities mark lines with paint or flags and that each type of utility has its own color; it gives gas, marked yellow, as an example. It also says to dig around the marks, not on them, because some lines are shallow and an unintended shovel thrust can cause a problem.
Which jobs need a call
Any digging counts, not only large projects. Indiana 811 says every digging project, big or small, including a fence or a mailbox, requires contacting it. Michigan's MISS DIG 811 names planting a tree or installing a fence, deck or pool, and Iowa One Call lists planting a tree and putting in a fence. Wisconsin's statute defines excavation to include digging, trenching, drilling and grading.
- Fence posts and gate posts. See fence installation.
- Deck footings and posts. See deck installation.
- Planting a tree or large shrub. See planting trees and shrubs.
- Stump grinding, which cuts below grade. See stump grinding.
- Irrigation trenches and sprinkler repairs. See lawn watering and irrigation.
- Grading and drainage work that moves soil. See grading and drainage.
Measure the posts or footings first with the fence and deck tool, so the locate request names the real area.
Notice periods differ by state
States set their own notice period, and LawnElm does not give a statewide figure that the state pages do not support. The table shows what the state pages on this site report from each state's own agency or one-call center. Use it to see the spread, not to plan your dig, because the rules change.
| State | Notice reported | Source named |
|---|---|---|
| Arizona | 2 working days | Arizona 811 |
| Colorado | 2 days, not counting the day of notice | Colorado 811 |
| Florida | At least two full business days | Sunshine 811 |
| Maine | Three business days (72 hours) | Maine Public Utilities Commission |
| Minnesota | At least 48 hours, not more than 14 calendar days ahead | Minnesota Statutes 216D.04 |
| Mississippi | At least 3 and no more than 10 working days | MS811 |
| Utah | At least 3 business days | Blue Stakes of Utah |
| Washington | No less than 2 and no more than 10 full business days | Utilities and Transportation Commission |
Several state pages could not confirm a figure, among them Louisiana, Maryland, Wyoming and the District of Columbia. For those, ask the 811 center how many working days it needs when you call. Even for states in the table, the days may be counted differently: weekends, holidays and the day of the call are handled in different ways, as the table's wording shows.
Who has to call, and for how long
Rules on homeowners are also state by state. The state pages on this site report these examples.
- Homeowners are included. Maine says anyone using power tools to penetrate the ground, homeowners included, must call. Washington says its dig law applies to anyone excavating, including homeowners. Minnesota's public safety page applies its rule to homeowners and says a hired contractor is responsible for the call.
- Exemptions are narrow. Kentucky's Public Service Commission says homeowners are only partly exempt and can still be penalized for hitting a gas line. Mississippi's exemption covers an owner digging less than 12 inches deep on private property without mechanical equipment. Oregon's owner exemption is limited to your own property, under 12 inches deep and outside any easement.
- Unclear in some statutes. Wisconsin's statute does not name homeowners, and Montana's page did not check the definition of an excavator. In those states, call 811 and ask.
Marks do not last forever. Kentucky 811 says a locate request is valid for 21 calendar days, Colorado 811 and Montana's law say 30 days, Washington says up to 45 days, and Oregon 811 says the ticket life changed from 45 to 30 days in 2026. If the work slips past the date, file a new request.
Digging near the marks
Michigan's MISS DIG 811 says to hand dig within 4 feet of paint or flags, and it says you cannot begin before the start time on your locate request, even if all utilities are marked. Other states set their own distance for digging near marks, so ask your center. Montana's page says that if you find a line that was not marked, you stop digging nearby and tell the owner or the center.
The Alliance describes the marks as approximate locations of buried utilities. They are not a permit or a property survey, and a fence or deck may also need a permit; see fence and deck permits. LawnElm does not give safety or legal advice. For a gas smell or a broken line, contact the utility or emergency services.
Questions people ask
Is calling 811 free?
Yes. The Common Ground Alliance describes 811 as free, and Iowa One Call and Washington's Utilities and Transportation Commission describe their locate requests as free too.
How many days before I dig should I call?
It depends on the state. The state pages on this site report 2 working days in some states and 3 business days in others, and several set a window that runs up to 10 business days. Ask the 811 center when you call, and see your state on the state yards map.
Do I have to call 811 to set a fence post?
Yes, call before any digging. Indiana 811 says every digging project, including a fence, requires contacting it, and Michigan's and Iowa's centers name fences. Whether the law covers a homeowner's own dig differs by state.
Who calls when a crew digs for me?
Ask before work starts. Minnesota says a hired contractor is responsible for the call, and Michigan's MISS DIG 811 says your contractor should make sure it is done. Get the ticket number in writing.
Sources
- 811 Before You Dig (Common Ground Alliance)
- Before You Dig, steps and marks (Common Ground Alliance)
- FCC Designates 811 as Nationwide Number to Protect Pipelines, Utilities from Excavation Damage (Federal Communications Commission)
Checked on November 20, 2026. The state figures in the table come from the state pages on this site, each of which names its own agency or one-call center; the FCC page was read without a date. Notice periods and exemptions change, so confirm with your state 811 center before you dig.
Next in the yard
-
Guide
Fence and deck permits
What to ask your building office about permits, setbacks and inspections before you build.
-
Yard job
Fence installation
Permits, property lines, post counts and what a written fence quote should say.
-
Yard job
Planting trees and shrubs
When to plant by belt, how wide and deep to dig, and how to mulch and water.